Below is a timeline of the renovation:
March 29, 2022 - Permission Granted by Archbishop Gustavo Garcia-Siller
May 16 - Agreement Signed with Architect for Pre-design Services
June 2 - Field Measure / Document Existing Conditions
June 9 - Develop Base Plans in CAD
June 16 - Develop Concept Drawings
June 16 - Order Geotch Soils Report
June 20 - Analyze Client's Budget of Proposed Design
June 29 - Develop Design Alanysis Report